index
:
redmine.git
0.6-stable
0.7-stable
0.8-stable
0.9-stable
1.0-stable
1.1-stable
1.2-stable
1.3-stable
1.4-stable
2.0-stable
2.1-stable
2.2-stable
2.3-stable
2.4-stable
2.5-stable
2.6-stable
3.0-stable
3.1-stable
3.2-stable
3.3-stable
3.4-stable
4.0-stable
4.1-stable
4.2-stable
5.0-stable
5.1-stable
6.0-stable
integration-to-svn-stable-1.0
integration-to-svn-trunk
master
nbc
plugin-hooks
swistak
work
Mirror of redmine code source: https://github.com/redmine/redmine
www-data
summary
refs
log
tree
commit
diff
stats
log msg
author
committer
range
path:
root
/
config
/
routes.rb
Commit message (
Expand
)
Author
Age
Files
Lines
*
Adds the ability for users to delete their own account (#10664). Can be disab...
Jean-Philippe Lang
2012-04-15
1
-0
/
+2
*
Adds missing route to project search.
Jean-Philippe Lang
2012-04-08
1
-0
/
+1
*
scm: fix revisions page "OK" button always returns 404 error (#10567)
Toshi MARUYAMA
2012-04-02
1
-4
/
+6
*
Ability to add non-member watchers on issue creation (#5159).
Jean-Philippe Lang
2012-03-24
1
-0
/
+2
*
Resourcified auth_sources.
Jean-Philippe Lang
2012-03-11
1
-16
/
+1
*
Merged LdapAuthSourceController into AuthSourceController.
Jean-Philippe Lang
2012-03-11
1
-15
/
+0
*
Fixed routing failure with jruby 1.6.
Jean-Philippe Lang
2012-02-27
1
-1
/
+3
*
Adds support for adding attachments to issues through the REST API (#8171).
Jean-Philippe Lang
2012-02-23
1
-0
/
+2
*
route: split issue preview route to adding and editing
Toshi MARUYAMA
2012-02-15
1
-2
/
+4
*
REST API for project memberships (#7420).
Jean-Philippe Lang
2012-02-06
1
-1
/
+1
*
Resourcified project memberships.
Jean-Philippe Lang
2012-02-05
1
-9
/
+3
*
Adds a "Manage related isses" permission to add/remove commits/issues relatio...
Jean-Philippe Lang
2012-02-05
1
-0
/
+8
*
route: repository: move :repository_id routes before non :repository_id routes
Toshi MARUYAMA
2012-01-29
1
-23
/
+26
*
route: scm: fix indents of repository revision requirement
Toshi MARUYAMA
2012-01-21
1
-2
/
+2
*
route: scm: add revision requirements for git/mercurial branches (#10026)
Toshi MARUYAMA
2012-01-21
1
-2
/
+8
*
Adds support for multiple repositories per project (#779).
Jean-Philippe Lang
2012-01-15
1
-18
/
+30
*
Resourcified repositories for CRUD operations to prepare for multiple SCM per...
Jean-Philippe Lang
2012-01-15
1
-10
/
+2
*
Ability to add non-member users as watchers (#5159).
Jean-Philippe Lang
2012-01-09
1
-1
/
+5
*
route: use ":controller" instead of ":as" for project_enumerations
Toshi MARUYAMA
2012-01-09
1
-1
/
+1
*
route: remove redundant :path_prefix from time entries route scoped under pro...
Toshi MARUYAMA
2012-01-08
1
-1
/
+0
*
route: move news after project scope
Toshi MARUYAMA
2012-01-08
1
-2
/
+3
*
Copy issues via bulk update action.
Jean-Philippe Lang
2012-01-07
1
-3
/
+0
*
Allows project to be changed from the bulk edit form.
Jean-Philippe Lang
2012-01-07
1
-1
/
+1
*
Makes /projects/:project_id/issues/new accept PUT requests for when serializi...
Jean-Philippe Lang
2012-01-06
1
-1
/
+1
*
route: code layout clean up timelog route
Toshi MARUYAMA
2012-01-05
1
-2
/
+5
*
route: fix messages quote action method defined at r8162
Toshi MARUYAMA
2012-01-04
1
-1
/
+1
*
route: simplify repositories route
Toshi MARUYAMA
2012-01-04
1
-3
/
+1
*
route: code layout clean up repositories route
Toshi MARUYAMA
2012-01-02
1
-5
/
+10
*
route: code layout clean up repositories route
Toshi MARUYAMA
2012-01-02
1
-18
/
+35
*
route: move time entries matchings and resources after /issues matchings
Toshi MARUYAMA
2011-12-31
1
-9
/
+9
*
route: move queries resources after projects resources
Toshi MARUYAMA
2011-12-30
1
-2
/
+1
*
route: change order users resources and matchings
Toshi MARUYAMA
2011-12-30
1
-4
/
+4
*
route: change order of some issues and projects resources and matchings
Toshi MARUYAMA
2011-12-30
1
-18
/
+18
*
route: move 'issues/new' matching before project/issues resources
Toshi MARUYAMA
2011-12-30
1
-3
/
+3
*
route: move attachments resources after matching
Toshi MARUYAMA
2011-12-30
1
-1
/
+1
*
route: code layout clean up versions resources
Toshi MARUYAMA
2011-12-30
1
-1
/
+3
*
route: code layout clean up project_enumerations route
Toshi MARUYAMA
2011-12-30
1
-1
/
+2
*
route: code layout clean up issues bulk deletion route
Toshi MARUYAMA
2011-12-30
1
-1
/
+2
*
route: code layout clean up issues resources
Toshi MARUYAMA
2011-12-30
1
-3
/
+7
*
route: code layout clean up issue_moves route
Toshi MARUYAMA
2011-12-30
1
-1
/
+2
*
route: code layout clean up issues context menu route
Toshi MARUYAMA
2011-12-30
1
-1
/
+3
*
route: code layout clean up previews route
Toshi MARUYAMA
2011-12-30
1
-1
/
+3
*
route: code layout clean up auto_completes route
Toshi MARUYAMA
2011-12-30
1
-1
/
+2
*
route: remove unused roles/workflow route
Toshi MARUYAMA
2011-12-29
1
-2
/
+0
*
route: code layout clean up bulk edit time logs
Toshi MARUYAMA
2011-12-29
1
-2
/
+4
*
route: code layout clean up new issues route
Toshi MARUYAMA
2011-12-29
1
-1
/
+2
*
route: code layout clean up wikis route
Toshi MARUYAMA
2011-12-29
1
-2
/
+4
*
route: simplify project settings and issues copy route
Toshi MARUYAMA
2011-12-29
1
-5
/
+5
*
route: code layout clean up activities route
Toshi MARUYAMA
2011-12-29
1
-1
/
+2
*
route: code layout clean up welcome route
Toshi MARUYAMA
2011-12-29
1
-1
/
+2
[next]