diff options
author | Josh Micich <josh@apache.org> | 2009-06-04 00:08:33 +0000 |
---|---|---|
committer | Josh Micich <josh@apache.org> | 2009-06-04 00:08:33 +0000 |
commit | 279211b52d5e5fef9fa800158dcbc896fbbf5c8d (patch) | |
tree | e70c7d81b2117608543121d97f1ef2c2e6cdf690 | |
parent | 1c5653ec5d71641fe51cf3633c3986837fd5942d (diff) | |
download | poi-279211b52d5e5fef9fa800158dcbc896fbbf5c8d.tar.gz poi-279211b52d5e5fef9fa800158dcbc896fbbf5c8d.zip |
Fix for javadoc error in Cell.setCellValue(Date) found by Mike Curwen
git-svn-id: https://svn.apache.org/repos/asf/poi/trunk@781624 13f79535-47bb-0310-9956-ffa450edef68
-rw-r--r-- | src/java/org/apache/poi/ss/usermodel/Cell.java | 18 |
1 files changed, 13 insertions, 5 deletions
diff --git a/src/java/org/apache/poi/ss/usermodel/Cell.java b/src/java/org/apache/poi/ss/usermodel/Cell.java index aa1e8c3955..0a76061e45 100644 --- a/src/java/org/apache/poi/ss/usermodel/Cell.java +++ b/src/java/org/apache/poi/ss/usermodel/Cell.java @@ -149,11 +149,19 @@ public interface Cell { void setCellValue(double value); /** - * Set a boolean value for the cell - * - * @param value the boolean value to set this cell to. For formulas we'll set the - * precalculated value, for booleans we'll set its value. For other types we - * will change the cell to a boolean cell and set its value. + * Converts the supplied date to its equivalent Excel numeric value and sets + * that into the cell. + * <p/> + * <b>Note</b> - There is actually no 'DATE' cell type in Excel. In many + * cases (when entering date values), Excel automatically adjusts the + * <i>cell style</i> to some date format, creating the illusion that the cell + * data type is now something besides {@link Cell#CELL_TYPE_NUMERIC}. POI + * does not attempt to replicate this behaviour. To make a numeric cell + * display as a date, use {@link #setCellStyle(CellStyle)} etc. + * + * @param value the numeric value to set this cell to. For formulas we'll set the + * precalculated value, for numerics we'll set its value. For other types we + * will change the cell to a numerics cell and set its value. */ void setCellValue(Date value); |